As July draws to a close, we’re happy to share more of the progress made by our contracting crews at the construction site of the Research and Innovation Center. Here’s what was completed this week:

  • Overhead FMEP on levels 1 through 5
  • Mechanical and plumbing insulation
  • Lights on levels 1 through 3
  • Miscellaneous framing and drywall on levels 1 through 5
  • Ceiling grid installation on levels 1 through 3
  • Paint on levels 1 through 5
  • Tile for the level 1 floor
  • Flooring on levels 1 through 3
  • DIRTT walls on levels 1 through 3
  • Seat walls and patio
  • Irrigation and landscaping
  • North grading and paving